Image - 2026-11-17 12:15
Edit ONLY the left side of the green roof shelter above the rain gutter to match the engineering cross-section: 1) Make the vertical dark green side wall (1.75m high) completely flat, straight, and flush with the plane of the left concrete facade wall right above the rain gutter and downspout—completely remove any bottom bulge or overhang above the wall. 2) At the very top edge of this vertical green wall (at 1.75m height), add a projecting sloped upper roof eave overhang (cantilevered rafters covered with dark green tarpaulin) jutting outward over the vertical green wall and rain gutter, casting a crisp shadow down onto the vertical green wall below it. 3) Keep everything strictly above the roofline—do NOT cover any concrete facade panels, windows, or balconies, and keep the right green gable front and overcast sky completely unchanged. Realistic exterior photography.
Free to start · Generate videos and images with AI in seconds